The project required the construction of 16 industrial units in 5 blocks including external works, SUDS and on site electrical and water mains.

  • Steel frame construction with brickwork and cladding external walls and roofing.
  • Power floated concrete floors.
  • All mains services provided including three phase electricity.
  • Powder coated aluminium double-glazed windows and doors.
  • The Scheme was delivered to successfully achieve BREEAM rating of ‘Excellent’.
  • Working in partnership with the client, architect and engineers, we were able to implement value engineering techniques to ensure all works were completed on time and to budget.
  • Environmental measures incorporated into the scheme included:

- Bio Mass Boiler to service the whole site with sustainable heat

- Reed Beds to filter run off surface water

- Photo Voltaic Brise Soleil’s

- Wind Catchers to maximise sustainable power production.

  • This project was completed safely, on time, within budget and to the highest standards of quality.