26 new homes for rent and shared ownership together with associated external works

Works

The project involved the relocation of slow worms prior to any works commencing on site and extensive consultation with local residents and stakeholders.

Substructure: Trench-fill concrete with PCC beam and block flooring.

Frame: Hybrid timber frame - 140 mm timber stud, OSB sheathing, breather membrane, 20mm air void, 120mm insulation and 20mm air void.

External Facing: Wienerberger Tuscan Red Multi, Wienerberger Harvest Buff and Redland Mini Stonewold Slate Brown roof tiles.

Heating: Baxi Neta-Tec Combination Boiler with thermostatically controlled wall mounted radiators.

Ventilation: Traditional extract ventilation - Manrose

Community

Pre-planning community consultation attended by the client, professional team and EG Carter & Co Ltd ensuring that the local community had a voice in discussing the proposals and addressing local issues prior to submission for planning permission.

Considerate Constructor Scheme

Visit 1 04.02.2016

Score 33 Good-Very Good

Overall

8 No 1B2P Flats

12 No 2B4P Houses

6 No 3B5P Houses